I am not sure if there are any external changes (there might be) but both interlocking machines on both ends of the New Haven siding have been upgraded and replaced.
Sometimes these changeovers are associated with new home signal changes.
This is following the redo of Dawkins last fall.
The Fostoria District CTC revamp project should be about done by now.
New Haven and Dawkins siding redone
Moderators: Moderator, Administrator
-
- Veteran
- Posts: 54
- Joined: Sat Nov 01, 2008 9:42 pm
Re: New Haven and Dawkins siding redone

- rrnut282
- Veteran
- Posts: 1929
- Joined: Mon Jan 09, 2006 9:43 am
- Location: M.P. CF161.8 NS's New Castle District
Re: New Haven and Dawkins siding redone
NS was building panels (and maybe a switch) inside the NE interlocking and a pair of new switches were sitting beside FourMile.
rrnut282
(Mike)
(Mike)
Re: New Haven and Dawkins siding redone
There is new CWR along the side of the track in New Haven that was made by SDI in Columbia City