Cutover to PTC on the NS Chicago Line

Discuss anything news-worthy from the area.

Moderators: Moderator, Administrator

Post Reply
User avatar
Notch 8
Veteran
Posts: 1614
Joined: Sat Feb 25, 2006 1:48 pm

Cutover to PTC on the NS Chicago Line

Post by Notch 8 » Wed Feb 07, 2018 5:30 am

I was told today that the cutover to PTC is to occur February 25th, do not know if this just applies to Ohio or if that means the Indiana section too ? I bet the new stuff won't last as long as whats being replaced ? By the looks of some of the installs it is safe to say they didn't have a level in the Job Box ? NS Crews were busy from Butler to Wauseon working trackside.

Mike

User avatar
rrnut282
Veteran
Posts: 2059
Joined: Mon Jan 09, 2006 9:43 am
Location: M.P. CF161.8 NS's New Castle District

Re: Cutover to PTC on the NS Chicago Line

Post by rrnut282 » Wed Feb 07, 2018 7:44 am

The signal lean seems systemic. Bad backfill will get ya almost every time.
rrnut282
(Mike)

User avatar
Greg46m
Site Admin
Posts: 779
Joined: Wed Jan 04, 2006 10:20 pm
Location: Bryan, OH
Contact:

Re: Cutover to PTC on the NS Chicago Line

Post by Greg46m » Wed Feb 07, 2018 8:05 pm

A lot of the Chicago Line installs were done by contractors if I remember correctly (seems like many, many years ago now). I wonder if they were setting these foundations on top of fill material without properly tamping it to begin with. The bungalow at CP-352 comes to mind as one where a huge amount of fill was brought in. One can only hope that the party's responsible for the shoddy installs will be compelled to come back and straighten things up rather than seeing all these crooked signals for the next 50+ years.
Greg Lavoie - Webmaster